Location: Planta Rincón 50 KTPA lithium compounds plant, Salar Rincón, Salta.

Description: Trade Off for alternatives for Electric Power supply from an existing 345 kV line to a new process plant located in the Salar de Rincón. Analysis of 2 possible alternatives as requested by the client:

1) Use of the existing maneuvering site in Cauchari, approximately 38 km from the location of the industrial plant.

2) Construction of a new maneuvering site near the 345 kV line to the industrial plant.